Installing Modules to Cabinets. ................................................................. 37
...................................................................... 39
Communication Cables between Modules. ............................................... 40
Power cables between Modules. .............................................................. 41
Insulation Resistance test and Puncture Test. .......................................... 44
System Voltage Tests When the Switch Is Open. ..................................... 46
Checking all Wirings and connections. ..................................................... 47
Check the torque has been applied on all points the power cable points. 48
In EMS + Grid Installation/Connection .......................................... 49