32
Copyright© BYD Europe B.V. all rights reserved.
•
Connecting the “S1N TO QL1
-
2” Cable to QLI2 port.
. Screw and torque with 18Nm and
draw a mark with marker
•
Connecting the “S2N TO BATT
-
” Cable to Batt
- port. Screw and torque with 18Nm and draw
a mark
Figure27 Line Arranging-4
S1N TO QL1-2
S2N TO BATT-