47
Copyright© BYD Europe B.V. all rights reserved.
Close Out of Battery Installation.
7.5.1
Checking all Wirings and connections.
Check the PDU power input cable, output cable, PDU power cord, network cable,
grounding wire, communication cables between modules and fan wirings are connected
properly. Follow the 2 diagrams in showed below. (See Figure59/60)
Figure59 High voltage Wiring Diagram-A
Figure60 Low Voltage Wiring Diagram-B