CCD
Operator's manual
Page 10 /35
Short Instructions/Setup
You need:
•
if possible a second person to lift the ma-
chine off the box
•
a small screw driver to secure the cables
•
a multiple socket
•
a drill backing board
•
adhesive tape
•
PCB material
•
tolls (drills/routers)
Examine the packaging for transport damage.
Open the lid of the packaging, remove anchoring straps
and, with the help of a second person, lift the machine out
of the box and set it to its destination. The ground should
be level and stable. Align the 4 levelling feet so that the
machine does not wobble. Examine the machine for pos-
sible transport damages.
Manual test:
With no cable connected, check manually
whether all three axis move freely. Check if the supplied
spindle easily rotates.
Setup:
Install the supplied Spindle. With the manual
spindle (4010) connect power cable to machine.
With the ATC (4054) also connect air supply to the socket
of the Y-axis. The spindle is factory set in a way so that a
drill or milling tool with the correct length (21 mm from the
tool tip to top of the ring; 38mm total length) can be
lowered to a maximum of 0.5 mm above the table. Thus
touching the table with the tools is not possible.
Connect the supplied vacuum cleaner. The suction tube is connected to
the suction nozzle underneath the Y-Axis (CCD/2: X-Axis) See picture
below). Included in the delivery is a start adapter. Put this start adapter
into the multiple socket and plug the the power supply of the vacuum
cleaner into this adapter. The small cable with the cinch plug is inserted
into the motor connection box of the CCD (CCD/2: the socket is in the
back of the control box underneath the machine table. If you run the va-
cuum cleaner with this adapter, the cleaner only starts, when the spindle
is turning.