![Buller Enterprises 4824a Additional Installation, Operation And Maintenance Instructions Download Page 8](http://html1.mh-extra.com/html/buller-enterprises/4824a/4824a_additional-installation-operation-and-maintenance-instructions_2829150008.webp)
PANEL PRO
8
The X axis cable will have 2 connectors with angle brackets. Locate the nuts with
screws installed on the bottom of the right rail. Allow enough room to comfortably
attach the motor plug. X2 axis is shown.
23. Attach the Y/Z cable and route cable with the 9 pin plug on the long cord to the Y
assembly
outboard
receptacle’
24. Route the pump power cord to the SC2B controller and connect to either AC
receptacle on the SC2B controller.
25. Locate the Z axis stop screw tie wrapped to the Z axis arm. Insert it in the Z axis
arm attached to the pneumatic cylinder.
26. Locate the Z axis up stop and install it as depicted. Under normal use, it should be
adjusted so the bumper takes the shock
just before the z axis hits the top of the
cylinder travel.
27. Remove Porter Cable router from its box.
The router base is not used in this
application and may be discarded if hand
routing is not anticipated. Also the ¼”
collet is provided, but not used with the
Panel Pro.
28. The ½” collet and ER11 collet adapter
have been installed and dialed in for
maximum accuracy. Do not loosen the
large Collet nut. If it is necessary to