3-8
User’s Guide
Loading a Domain Configuration Scheme
To power on server domains, you must first load the required
Domain Configuration
Scheme
from the
Domain Manager
Control pane. Once the domain configuration scheme
has been loaded, domains can be powered up simultaneously or independently.
To load a scheme:
1. Click
Domain Manager
to open the Control pane. If a scheme has not been previously
loaded, you are invited to load one.
Note:
If the required scheme is already loaded, it is available for domain management.
If a scheme is already loaded, but is not the required scheme, see
Adding Domains to the
Current Domain Configuration
and
Replacing the Current Domain Configuration
below.
2. Click
Schemes
in the Toolbar to open the
Schemes List
dialog.
Figure 40.
Schemes list dialog
3. Select the required
Scheme
from the list and click
Preview
to view scheme properties.
See
Viewing Domain Configuration Schemes
4. Click
Apply
. A dialog box informs you that the selected scheme will replace the current
domain configuration.
5. Click
Yes
to confirm. All the domains included in the selected scheme are loaded in the
Control pane and are available for management.
Summary of Contents for NovaScale 5 5 Series
Page 1: ...Bull NovaScale 5xx5 6xx5 User s Guide 86 A1 41EM 00 ORDER REFERENCE...
Page 2: ......
Page 52: ...1 24 User s Guide...
Page 76: ...2 24 User s Guide...
Page 168: ...5 2 User s Guide...
Page 288: ...User s Guide A 10...
Page 300: ...B 12 User s Guide NovaScale 5165 Server Data Cabling Diagrams Internal Disk Configuration...
Page 304: ...B 16 User s Guide NovaScale 6165 Server Data Cabling Diagrams Internal Disk Configuration...
Page 362: ...C 48 User s Guide...
Page 372: ...User s Guide G 10...
Page 378: ...User s Guide X 6...
Page 381: ......
Page 384: ......