2-17
Getting Started
To power up server domains:
1. From the PAM Tree, click
Domain Manager
to open the
Control
pane. You are invited
to load a domain configuration scheme.
2. Click
Schemes
. The
Schemes List
dialog opens displaying the pre–configured scheme.
3. Select
MyOperationsScheme
and click
Apply
.
Figure 35.
Domain schemes list dialog
4. When requested, click
Yes
to confirm.
MyOperations–1, MyOperations–2,
MyOperations–3,
and
MyOperations–4
domains are loaded in the
Control
pane.
If the domains are ready to be powered up,
INACTIVE
is displayed in the
Domain State
boxes and the
Power On
button is accessible for each domain.
Figure 36.
Domain Manager Control pane
Summary of Contents for NovaScale 5 5 Series
Page 1: ...Bull NovaScale 5xx5 6xx5 User s Guide 86 A1 41EM 00 ORDER REFERENCE...
Page 2: ......
Page 52: ...1 24 User s Guide...
Page 76: ...2 24 User s Guide...
Page 168: ...5 2 User s Guide...
Page 288: ...User s Guide A 10...
Page 300: ...B 12 User s Guide NovaScale 5165 Server Data Cabling Diagrams Internal Disk Configuration...
Page 304: ...B 16 User s Guide NovaScale 6165 Server Data Cabling Diagrams Internal Disk Configuration...
Page 362: ...C 48 User s Guide...
Page 372: ...User s Guide G 10...
Page 378: ...User s Guide X 6...
Page 381: ......
Page 384: ......