
3-6
User’s Guide
Synchronizing NovaScale 5xx5 Server Domains
The
Synchronize Domains
command is used to load the NovaScale 5xx5 Server domain.
Each NovaScale 5xx5 Server is delivered with one pre–configured domain.
To load the server domain:
Click
Synchronize Domains
in the toolbar. The server domain(s) appear(s) in the Control
pane for management.
The other
Schemes
tool options are reserved for partitioned (NovaScale 6xx5 Servers) or
extended systems. See
Configuring and Managing Extended Systems
Viewing a Domain Configuration Scheme
Before loading a domain configuration scheme, you may want to know more about its
scope.
To view a scheme:
1. Click
Domain Manager
to open the Control pane.
2. Click
Schemes
in the Toolbar to open the
Schemes List
dialog.
Figure 38.
Schemes list dialog
3. Select the required
Scheme
from the list and click
Preview
to view scheme properties.
Summary of Contents for NovaScale 5 5 Series
Page 1: ...Bull NovaScale 5xx5 6xx5 User s Guide 86 A1 41EM 00 ORDER REFERENCE...
Page 2: ......
Page 52: ...1 24 User s Guide...
Page 76: ...2 24 User s Guide...
Page 168: ...5 2 User s Guide...
Page 288: ...User s Guide A 10...
Page 300: ...B 12 User s Guide NovaScale 5165 Server Data Cabling Diagrams Internal Disk Configuration...
Page 304: ...B 16 User s Guide NovaScale 6165 Server Data Cabling Diagrams Internal Disk Configuration...
Page 362: ...C 48 User s Guide...
Page 372: ...User s Guide G 10...
Page 378: ...User s Guide X 6...
Page 381: ......
Page 384: ......