Installing the boiler
Logano plus GB312 - Technical specifications are subject to change without prior notice
40
V
Route all cables through the cable conduits to the pro-
gramming and connect them in accordance with the
wiring diagram.
Secure all cables with cable grips (supplied).
V
Insert the cable grip together with the cable from the
top into the slots in the frame (step 1).
V
Slide the cable grip downwards (step 2).
V
Push against the grip (step 3).
V
Flip the toggle up (step 4).
Fig. 34 Securing cables with cable grips
V
Slot the programming unit cover into the guides and
slide downwards.
V
Secure the programming unit cover with the two
screws.
Fig. 35 Fitting the cover
6.12.2 Leveling the boiler
The boiler must be leveled so that the side panels and
front panel can be fitted.
V
Loosen the nuts.
V
Screw the adjustable feet in or out so as to level the
boiler with the aid of a spirit level.
V
Retighten the nuts.