Table of contents
Büchi Labortechnik AG
iv
Operation Manual Rotavapor® R-250 Pro
Installing the glassware ....................................................................................................... 22
5.4.1 Glassware assembling instructions .......................................................................... 22
5.4.2 Installing the inlet valve (example)............................................................................ 24
5.4.3 Installing the distribution piece (example)................................................................. 24
5.4.4 Installing the glass assembly R (option) ................................................................... 25
5.4.5 Installing the glass assembly D (option) ................................................................... 26
5.4.6 Installing the double receiver .................................................................................... 27
5.4.7 Installing the single receiver (option) ........................................................................ 28
5.4.8 Connecting the receiver with the glass assembly (example).................................... 28
Installing the vacuum supply ............................................................................................... 29
5.5.1 Installing the vacuum pump holder (option).............................................................. 29
5.5.2 Installing a BUCHI vacuum pump (option)................................................................ 29
5.5.3 Installing a non BUCHI vacuum pump (option)......................................................... 30
5.5.4 Installing the vacuum connection glass assembly R (option) ................................... 30
5.5.5 Installing the vacuum connection glass assembly D (option) ................................... 32
Installing the cooling water supply....................................................................................... 33
5.6.1 Installing the cooling water supply with a recirculating chiller (option)...................... 33
5.6.2 Installing the cooling water supply without a recirculating chiller (option)................. 34
Heating bath installations .................................................................................................... 35
5.7.1 Installing the splash protection (option) .................................................................... 35
5.7.2 Installing the heating bath replenishment (option) .................................................... 36
5.7.3 Installing the drain connection at the heating bath ................................................... 36
5.7.4 Setting the heating bath reaction during a power interruption .................................. 36
Installing the sensors........................................................................................................... 37
5.8.1 Installing the vapor temperature sensor ................................................................... 37
5.8.2 Installing the cooling temperature sensor (option).................................................... 37
5.8.3 Installing the foam sensor (option)............................................................................ 38
5.8.4 Installing the cooling water flow sensor (option) ....................................................... 38
5.8.5 Installing the level sensor (option) ............................................................................ 39
5.8.6 Setting up the sensors .............................................................................................. 39