
Büchi Labortechnik AG
Installation | 5
Operation Manual Rotavapor® R-250 Pro
21/78
5
Installation
5.1
Before installation
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u
Climatize the instrument after transportation.
5.2
Establishing electrical connections
WARNING
Death or serious burns by electric current.
u
Have the installation carried out by an electrician or a person with similar expert
knowledge.
u
After installation, check electrical safety.
The instrument is design for stationary installation.
Precondition:
R
R
The installation site is as specified in the technical date. See Chapter 3.5
"Technical data", page 17
u
Have the installation carried out by an electrician or a person with similar expert
knowledge.
u
Carry out the installation according to the instructions. See
"Guide for electrical
installation "
5.3
Installing the support rod
u
Attach the support rod to the instrument.