5 | Installation
Büchi Labortechnik AG
24/78
Operation Manual Rotavapor® R-250 Pro
Assembling instruction receiving vessel support
u
Put the receiving vessel support on the
instrument.
Assembling instruction shut off tap
NOTICE! Tighten the shut off tap with your
hands.
u
Attach the shut off tap to the glassware using
the white handle.
5.4.2
Installing the inlet valve (example)
u
Attach the inlet valve to the distribution piece.
5.4.3
Installing the distribution piece (example)
u
Attach the distribution piece to the gear box.
u
Close the easy clamps.
1
2
2
3
u
Secure the distribution piece in place.