Büchi Labortechnik AG
Installation | 5
Operation Manual Rotavapor® R-250 Pro
33/78
5.6
Installing the cooling water supply
5.6.1
Installing the cooling water supply with a recirculating chiller (option)
Precondition:
R
The recirculating chiller is prepared. See
related documentation.
R
The inlet water hose for the condenser is
prepared.
u
Connect the chiller cable to the related
connection on the instrument. See Chapter 3.2
"Configuration", page 13
u
Attach the inlet water supply hose to the Y-
piece.
u
Attach the inlet condenser hoses to the Y-piece.
u
Secure the hoses in place with a hose clamp.
u
Attach the water hose to the inlet connection.
u
Attach the hose to the outlet connection.
u
Attach the outlet water supply hose to the Y-
piece.