Büchi Labortechnik AG
Product description | 3
Operation Manual Rotavapor® R-250 Pro
13/78
3.2
Configuration
3.2.1
Front view
3
4
5
6
18
16
14
13
12
15
17
11
1
2
7
8
9
10
Fig. 2: Front view (example glassware)
1
U-tube
2
Distribution piece
3
Gear box
4
Snap flange coupling
5
Evaporation flask
6
Heating bath
7
Castor wheels
8
Holder vacuum pump (option)
9
Drain valve heating bath
10 Heating bath lift
11 Hex key for snap flange coupling
12 On/Off master switch
13 Drain valve receiver
14 Interface
15 Interface Pro
(see
"Operation Manual Interface
I-300Pro "
)
16 Receiver flask
17 Cooling water tap
18 Shut off tap