
Pin inputs
Pin 4 can have an RPS output associated or key
switch with it. (See Output 2).
Pins 1 – 8 can be set up for End of Line (EOL)
and Dual End of Line (DEOL) interconnection
monitoring.
Default outputs
Output 1 (COMMS)
Output 1 acts as the communications fail output.
1.
Single path fault
Will operate when the path fails.
Output 2 (FUNC)
Output 2 has three configuration options:
1.
User control output
This can be remotely operated via the web
portal or app.
2.
RPS output for Pin 4
This output will operate when input Pin 4 is
triggered. It will return when an ‘acknowledge’
signal is returned from the BT Redcare platform.
The output has a minimum operation time of
one second. When the acknowledgement is
received less than one second after Pin 4 is
triggered, the output will remain operated for
one second.
3.
Keyswitch
Set or unset the alarm system in conjunction
with the BT Redcare app.
Defaults for Output 1 and 2
Output 1 is set to single path fault, Output 2 is set
to User.
Relay status with path fail in operation
NO
C
COMMS
NC
Condition
Relay
Terminal
Power Off
Output 1
C <-> NC
Path Up and Registered
Output 1
C <-> NO
Path fail
Output 1
C <-> NC
11