Technical data
and start-up
EVB1-350/400-40-HP
66
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
28.
Tighten the cable glands (1) and the union nuts (2)
with the special key (3).
29.
Remove the protective caps for the cooling water
connection pieces (1) and connect the cooling water
pumps with the hose clips.
30.
Start the software
PARAM
.
---
31.
Check the set parameters with the software
PARAM
or adapt these to your requirements.
See chapter
10.3 Changing the CAN Parameters
---