![Brusa EVB1-350-40-HP Technical Data And Start-Up Download Page 64](http://html1.mh-extra.com/html/brusa/evb1-350-40-hp/evb1-350-40-hp_technical-data-and-start-up_2821421064.webp)
Technical data
and start-up
EVB1-350/400-40-HP
64
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
20.
Ensure that the washers (1) are positioned.
21.
Set the magnetic cores (1) one behind another on
the HV wiring (2).
22.
Lead the prepared HV cable (1) through the cable
gland (2) in the BMS.
You must ensure that the washers are
positioned on the HV contacts before you attach
the cable lugs! (See procedure step 20)
Check whether the terminal insert (3) fits closely
into the cable gland (2). Here the cable lug must
sit on the thread bolt.
How to modify the cable, you can see in chapter
23.
Remove the insulating tape from the terminal insert.
---