61
Technical information
and start-up
BSC624-12V-B
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
6.
Put the gland base (1) over the terminal insert (2).
Remove the insulating tape.
Screw together the gland base (1) with the union
nut (3).
At this stage, only attach the union nut manually.
7.
Put the carrier housing (1) onto the gland base (2)
and tighten it.
Tighten the gland base (2) at the carrier housing
(1) with a torque of 15 Nm.
8.
Strip both strand ends (1) of the delivered interlock
bridge to a length of 9 mm.
Mount the crimp contact sockets (2) included in the
scope of delivery onto the strand ends (1).
Further information can be found in chap.