75
Technical information
and start-up
BSC624-12V-B
Procedure step
Illustration / other information
7.
The installation process will be carried out.
8.
After the installation has been successfully
completed, the following dialogue appears.
Click the
Finish
button (1).
The installation of FDT is now completed. Now,
follow the further instructions.
9.
Upon completion of the installation, execute the file
fdt3_05_prota_A.EXE
.
10.
Select the installation directory.
The installation path is to be adapted in order to
allow for the kernels to be installed in the
FDT4.08
folder.
Example:
C:\Programme\Renessas\FDT4.08
Click the Next button (1).