Technical information
and start-up
BSC624-12V-B
58
Procedure step
Illustration / other information
9.
Implement the HV lines and the HV power
connector.
9.1 Producing the cable glands for the
---
10.
Connect the HV power connector (1) with the device.
11.
Connect the battery cable to the HV battery.
---
12.
Manually check that all cable and hose connections
are tightly fit.
All electrical connections are to be fixed within a
distance of < 30 cm from the device with a strain
relief in order to protect the cable and/or the
cable harness at the control connector against
vibration.
---
INFORMATION
The installation of the device is now complete. You can commission the device. The operation of the
device may be implemented by means of customer-specific CAN tools or via the BRUSA-specific
PARAM
software. This software is ideally aligned to the device and can be purchased optionally. To
do this, please contact the manufacturer under the address provided in chapter
.