Hardware Installation for the D8 ADVANCE
VÅNTEC-1 Detector User Manual
4 - 8
M88-E01072
4.4.4 Connect the Power Supply
Check that the detector controller power cord is
connected to X601 on the left side of the D8
enclosure. The FDC controller must also be
connected to the mains power.
Servicing Precautions—When the equipment is
connected to the mains supply, some terminals
of the mains distribution unit may be live.
Therefore, it is absolutely necessary to switch
off the external mains supply before opening the
housings. It is not sufficient to just press the on/
off power switch on the VÅNTEC-1 controller.
The mains supply must be switched off
externally on the customer’s side (wall socket or
external switch).
4.5
Hardware Installation (for detec-
tor controllers with an inte-
grated FDC)
4.5.1 Mount the Rails.
1.
Relocate the existing rails, A in Figure 4.4,
for adequate airflow.
2.
Mounting the rails requires removing the
front and rear columns of the system.
Remove the screws located at position B in
Figure 4.4 to detach the columns.
Figure 4.4 - Column and rail locations
Summary of Contents for VANTEC-1
Page 1: ...V NTEC 1 Detector USER MANUAL M88 E01072 5 05 BRUKER ADVANCED X RAY SOLUTIONS...
Page 2: ......
Page 3: ...V NTEC 1 Detector User Manual BRUKER ADVANCED X RAY SOLUTIONS M88 E01072 5 05...
Page 34: ...System Description V NTEC 1 Detector User Manual 3 20 M88 E01072...
Page 76: ...Hardware Installation for the D4 ENDEAVOR V NTEC 1 Detector User Manual 5 10 M88 E01072...
Page 96: ...Calibration V NTEC 1 Detector User Manual 7 8 M88 E01072...
Page 102: ...Alignment V NTEC 1 Detector User Manual 8 6 M88 E01072...
Page 122: ...Appendix A Configuration Tables V NTEC 1 Detector User Manual A 4 M88 E01072...
Page 128: ...Appendix B Spare Parts List V NTEC 1 Detector User Manual B 6 M88 E01072...
Page 137: ...M88 E01072 D 1 Appendix D EC Declaration of Conformity See the figure on the next page...
Page 138: ...Appendix D EC Declaration of Conformity V NTEC 1 Detector User Manual D 2 M88 E01072...