![BRP E250DHLSCS Service Manual Download Page 43](http://html1.mh-extra.com/html/brp/e250dhlscs/e250dhlscs_service-manual_2820607043.webp)
41
INSTALLATION AND PREDELIVERY
BOAT RIGGING
2
Clamp Installation
A constant stress should be applied to close the
ear clamps. This method ensures a positive stress
on the hose and does not result in excessive com-
pression or expansion of the band material.
IMPORTANT:
Use only
Oetiker
recommended
tools to close
Oetiker
stepless clamps.
Oetiker
pincers are available in the
Evinrude/Johnson Genuine Parts and Accesso-
ries Catalog
(P/N 787145).
•
Position correct size clamp over hose.
•
Install hose on fitting.
•
Close clamp ear fully with
Oetiker
pincers (pli-
ers).
Clamp Removal
Method 1:
Position
Oetiker
pincers across clamp
ear and cut clamp.
Method 2:
Lift end of stepless clamp with screw-
driver.
Method 3:
Use
Oetiker
pincers (pliers) to grip
clamp. Pull clamp off of connection and discard.
DP0886
1.
Open clamp
2.
Closed clamp
000092
1
2
000108
000090
000091
Summary of Contents for E250DHLSCS
Page 1: ......
Page 2: ......
Page 191: ...OILING SYSTEM OIL SUPPLY DIAGRAMS V6 189 9 006870 Rear View 6 4 5 3 Top View 1 2...
Page 216: ...214 POWERHEAD SERVICE CHART Taper Pin Tool Hole for Storage Scale FULL SIZE...
Page 242: ...240 POWERHEAD POWERHEAD VIEWS POWERHEAD VIEWS Port Hose Routings 006972...
Page 243: ...POWERHEAD POWERHEAD VIEWS 241 11 Starboard Hose Routings 006952...
Page 244: ...242 POWERHEAD POWERHEAD VIEWS Port 006993...
Page 245: ...POWERHEAD POWERHEAD VIEWS 243 11 Starboard 006973...
Page 246: ...244 POWERHEAD POWERHEAD VIEWS Front 006974...
Page 247: ...POWERHEAD POWERHEAD VIEWS 245 11 Rear 006975...
Page 248: ...246 POWERHEAD POWERHEAD VIEWS Top 006957...
Page 252: ...250 MIDSECTION SERVICE CHART 004117...
Page 348: ...S 2...
Page 380: ......
Page 389: ......
Page 396: ......