121
SYSTEM ANALYSIS
FUEL DELIVERY TESTS
6
If the pump does not run:
•
The
EMM
controls power to the fuel pump (pur-
ple/black wire). Check voltage at pin 1 of fuel
pump connector. Voltage should be 12 V when
KEY is first ON, when fuel pump test activated,
or when outboard is cranking or running.
•
Use an ohmmeter to check continuity between
pin 2 of fuel pump connector and ground.
•
Circulation Pump Resistance Test
If the pump runs:
•
Refer to
•
Fuel Injector Static Test
Use the
Evinrude Diagnostics
software Fuel Injec-
tor Static Test to activate each fuel injector. Listen
for an audible “click” from each injector when it is
actuated. If the injector activates, the
EMM
and
injector circuits are not at fault.
IMPORTANT:
This test is operating the injec-
tors with 30 V on the system voltage (55 V) circuit.
The start assist circuit (SAC) of the
EMM
converts
battery voltage (12 V) to 30 V of system voltage.
Battery must be fully charged and connections
must be clean and tight. Injector activation should
be carefully confirmed.
Results:
No injectors actuate:
•
Use the
Monitor
screen of the diagnostics soft-
ware to make sure voltage is present on the
system voltage circuit.
•
Refer to
Some injectors actuate; some do not:
•
Test the resistance of individual injector circuits
between the injector connector and injector con-
trol wire at the
EMM
.
•
All injectors actuate:
•
Refer to
Running Fuel System Tests
Run or crank the outboard.
Use the
Evinrude Diagnostics
software
Monitor
screen to check system voltage. If voltage is low,
or drops as RPM increases, refer to
Use an inductive timing light to monitor the injec-
tor control wire (connector pin 2) for each injector.
Make sure the pickup is attached to only one wire.
Flashes on the timing light indicate current in the
circuit is being switched by the
EMM
. The
Dynamic Tests
screen allows the control signal to
be turned off to a particular injector.
IMPORTANT:
Some timing lights may not flash
consistently at cranking speeds. Always check the
orientation of the timing light pickup and the oper-
ation of the timing light.
Static Tests Screen
006813
Summary of Contents for E250DHLSCS
Page 1: ......
Page 2: ......
Page 191: ...OILING SYSTEM OIL SUPPLY DIAGRAMS V6 189 9 006870 Rear View 6 4 5 3 Top View 1 2...
Page 216: ...214 POWERHEAD SERVICE CHART Taper Pin Tool Hole for Storage Scale FULL SIZE...
Page 242: ...240 POWERHEAD POWERHEAD VIEWS POWERHEAD VIEWS Port Hose Routings 006972...
Page 243: ...POWERHEAD POWERHEAD VIEWS 241 11 Starboard Hose Routings 006952...
Page 244: ...242 POWERHEAD POWERHEAD VIEWS Port 006993...
Page 245: ...POWERHEAD POWERHEAD VIEWS 243 11 Starboard 006973...
Page 246: ...244 POWERHEAD POWERHEAD VIEWS Front 006974...
Page 247: ...POWERHEAD POWERHEAD VIEWS 245 11 Rear 006975...
Page 248: ...246 POWERHEAD POWERHEAD VIEWS Top 006957...
Page 252: ...250 MIDSECTION SERVICE CHART 004117...
Page 348: ...S 2...
Page 380: ......
Page 389: ......
Page 396: ......