Airplane Maintenance Manual
Bristell
B23
Chapter 05
Chapter 05 Page 14
Issue: 30-Sep-2020
Prescribed works
Made by
Checked by
Check for pitot-static system tightness (see Chapter 34-10-10
Checks
)
Heating and Ventilation System
Check cleanness and passage of air inlet holes.
Check line and integrity of the heating and ventilation system
hoses.
Check condition and attachment of the heat exchanger.
Check condition of the cabin heat mixer mounted to the
firewall.
Check closing function secure of heat shut off valve at
firewall (visual inspection with removed heating hose).
Navigation/Communication
Visually check condition of navigation and communication
instruments.
Check function of navigation and communication instruments
-
annual inspection only
Check altimeter function -
annual inspection only
Perform L-3 Aviation Products battery calibration
Finalization
Close all access hatches, remount fairings and cowling
Perform ground run and check flight
Notes:
Date:
.........................
Signature: ........................