Bristell B23
Airplane Maintenance Manual
Chapter 05
Issue: 30-Sep-2020
Chapter 05 Page 9
05-20-04 Annual Periodical Inspection or
Inspection after 100 Flight Hours
Aircraft S/N.:
…………………
Total flight hours:
…………
Registration mark:
…………………
No. of takeoffs:
…………
Prescribed works
Made by
Checked by
AIRFRAME
Preparation
Perform aircraft daily inspection and engine start up, run up
and shut down per AFM. Check all related functions.
Check function of fuel selector valve during run up by closing
it. Engine must then stop within 30 seconds.
Remove wing joint fairing
Remove cowling
Remove all access panels wing, stabilizer and fuselage
Remove seats and open panels behind seat
Fuselage
Visually check surface condition including composite parts -
loosened rivets, deformation, cracks and some other
damage.
Check condition of fuselage-wing fairings.
Check condition and attachment of the tailskid.
Check condition and attachment of the canopy.
Check condition and functions of vents.
Check condition and function of the canopy locks.
Check condition and completeness of emergency equipment.
(hammer in glove box)
Check condition of rubber sealing of the cockpit.
Check condition of canopy struts.
Wing
Visually check surface condition loosened rivets,
deformation, cracks and some other damage.
Check play in the wing attachments.
Check condition and attachment of the wing tips.
Check condition of the position lights.
Check conductive wing-fuselage connection.
Check wing locker box condition and drain
Check wing locker locking mechanism