
Then pull off protective cap
and remove battery positive
cable
3
.
Lift out battery upward; if it
is difficult to move, moving it
back and forth will help.
Installing battery
Make sure the ground is
level and firm and park the
motorcycle.
Switch off the ignition.
Insert the battery into the
battery compartment, with
the positive terminal on the
right in the direction of trav-
el.
Hook in battery retaining
strap at bottom, push over
battery and tighten screw
1
with torque.
An incorrect connection
sequence increases the
risk of short-circuiting.
Always observe the proper
sequence.
Never install the battery with-
out the protective cap.
Install positive cable
3
first
and hand-tighten screw.
Push protective cap onto
battery positive terminal.
Then install negative cable
2
and hand-tighten screw.
Switch on the ignition.
Without starting engine,
hold throttle twistgrip in ful-
ly open position for at least
one second so that elec-
tronic engine management
system can register throttle-
valve settings.
Switch off the ignition.
Installing driver's seat
(
58)
Installing passenger seat
(
59)
Setting clock (
42)
7
125
z
Maintenance
Summary of Contents for R 1200 RT 2005
Page 1: ...BMW Motorrad Freude am Fahren Rider s Manual US Model R 1200 RT ...
Page 6: ...Confirmation of service 156 ...
Page 10: ...1 8 z General instructions ...
Page 12: ...2 10 z Overviews ...
Page 14: ...2 12 z Overviews ...
Page 16: ...2 14 z Overviews ...
Page 21: ...Headlight 1 High beam headlight 2 Low beam headlight 3 Side lights 2 19 z Overviews ...
Page 22: ...2 20 z Overviews ...
Page 38: ...3 36 z Status indicators ...
Page 68: ...4 66 z Operation ...
Page 76: ...5 74 z Riding ...
Page 78: ...5 76 z Riding ...
Page 80: ...5 78 z Riding ...
Page 82: ...5 80 z Riding ...
Page 92: ...6 90 z Accessories ...
Page 128: ...7 126 z Maintenance ...
Page 134: ...8 132 z Care ...
Page 159: ...Work carried out at miles Date 10 157 z Service ...