19
CHAPTER 3: Operation
2. Press the NTWRK button repeatedly until the
PING test is displayed on the screen (if the tester is
turned off, press the NTWRK button twice). Press
the SEL button to enter the test. Several status
screens will be displayed while establishing a link
and negotiating the DHCP configuration. Once
PINGing begins, a PING status screen will be
displayed, showing acronyms for each active
conversation.
3. Press the left or right arrows to move the cursor
next to a device acronym. Press the SEL button to
advance to the next screen or the screen will
advance automatically after 10 seconds.
3.7 To Validate a Cable Link by Functional Testing
You can use two LAN Solution Network Testers to
exercise a cable link without requiring additional
equipment. You can also do this through a hub or switch
with or without any other equipment being present.
We’ll refer to the two testers as the Validator and the
PING Generator. The Validator uses the Validate Link
mode, and the PING Generator uses the PING Test
mode.
1. Connect the Validator to one end of the link you
want to test.
Summary of Contents for TS560A
Page 3: ......
Page 63: ...60 LAN SOLUTION NETWORK TESTER Figure 7 5 Split pair ...