INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Bisolid Automat OM-BAV05/02/2018/EN
59
All activities on the electrical installation of the burner, adjustments, where
covers and other items are removed that protect against contact with live parts,
should only be performed by a qualified person.
The burner should be connected to the electrical installation of the equipment
to which it is installed, complying with the safety rules. Use the power cable
and the attached diagram for connection to the supply voltage and to the
command module of the burner.
Connectinion of the room thermostat. It is possible to use room thermostat
ONLY
in case of boiler operation with pellets. Before connecting the room
thermostat to the connector (moving part) for ROOM THERMOSTAT
(positioned on the back of the boiler
’
s side cover panel), remove the factory
installed bridge in the connector. Use only room thermostat contact without
external voltage! See electrical connections!
The installation of the socket, respectively the water temperature sensor Pt1000 is carried out
according to the diagram shown in Figure 21.
Figure 21. Installation of the water temperature sensor
Installation of the temperature sensor should be performed as shown on
the above presented diagram.
This is safety related operation and should be performed by a qualified
technical person!
Socket for
mounting sensor
Pt1000
Place for mounting
sensor Pt1000