INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Bisolid Automat OM-BAV05/02/2018/EN
57
8. WIRING DIAGRAME OF THE BOILER WITH THE PELLET BURNER
Figure 19. Wiring diagrame of a boiler with Bisolid GP xx R tsc pellet burner
It is recommended the pump’s control to be made by using external thermostat
and UPS (uninterruptible power supply) that provides emergency power to a
load when the input power source or mains power fails.