![Beta Max MAXIAL TRACK HOIST Use And Maintenance Instruction Manual Download Page 52](http://html1.mh-extra.com/html/beta-max/maxial-track-hoist/maxial-track-hoist_use-and-maintenance-instruction-manual_2742610052.webp)
Use and Maintenance Instruction Manual
MAXIAL TRACK HOIST
REV. 2.2 (2017)
INSTALLATION
Page | 5-3
5.3 INSTALLATION PROCEDURE
Once the ideal location for the Maxial Track Hoist has been determined, the setup and
operation are not complicated. There are no tools necessary for installing your Maxial Track
Hoist. When deciding upon the most suitable position for the hoist, several items are to be
considered. These include whether the unit is to be attached to modular or frame scaffolding,
whether the operating system is centrally located, and whether the scaffold carrier clearances
are satisfied.
1. Using a 9 ft 9 in. (3.0 m) section of track, lay the track flat on the ground.
Notice that the rungs are not centered front to back on the track. Track should be
positioned with rungs closer to ground than to installer.
2. Insert the Base Feet into the bottom of the 9 ft 9 in (3.0m) section of track.
3. Fasten the Base Feet to the track with a Kwik bolt in each foot assembly. When
installing the Kwik Bolt there is no need to remove the wing nut and washer. Push
the Kwik Bolt through and turn 90 degrees. Hold in place and tighten the wing nut.
Figure 5.1
Figure 5.2
Summary of Contents for MAXIAL TRACK HOIST
Page 2: ......
Page 117: ......
Page 118: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 149: ......
Page 150: ......
Page 153: ......
Page 154: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......