Preparing for installation
21
CAUTION
Risk of injury due to the heavy
extractor hood falling down.
¾
Only lift the device with two persons.
¾
Protect the surfaces of the working area e.g. with
thick cardboard.
¾
Remove the device from the packaging.
¾
Lay the device, with the front side facing up, on a
flat, protective surface.
Checking the scope of delivery
¾
Check that the supplied parts are complete, as
described in the following section.
¾
Check the supplied parts for damage.
¾
If parts are damaged or missing, contact your
specialist berbel dealer or the customer service.
Air extraction device scope of delivery
Number Designation
1
Extractor hood
1
Installation instructions
1
Operating instructions
2
Installation rails
1
Wieland socket (connected to the
Wieland connector in the extractor
hood)
6
Nylon plugs, 8 mm
6
Screws
6
Washers
Recirculated air device scope of delivery
Number Designation
1
Extractor hood
1
Installation instructions
1
Operating instructions
2
Installation rails
1
Wieland socket (connected to the
Wieland connector in the extractor
hood)
6
Nylon plugs, 8 mm
6
Screws
6
Washers
2
Recirculating air filters BUF 150 K