EN
Installation and operating manual
DRYPOINT
®
M eco control
33
8. Insert the O-rings into the housing bottom.
Secure O-rings against slipping or falling out.
9. Place the control unit on the (
DRYPOINT
®
M
) housing.
10. Tighten the fixing screws with washers for the
membrane dryer head using an Allen key.
Ø = 4 mm
M = 2,5 Nm + 0,5 %
11. Check the housing seal for a correct fit in the hood
groove.