Installation and operating manual
EN
38
DRYPOINT
®
M eco control
8
10
13
13. Screw the housing base [10] with float drain [13] into the
housing extension [8].
8
14.
Screw the housing extension [8] with float drain onto the
housing [12].
25
9
1a
1b
2
15. Attach a new maintenance sticker [9] on the
housing extension [8].
Mark when the next maintenance is due.
16. Slowly open the shut-off valves [1a].
17. Slowly open the shut-off valve [1b].
18. Close the shut-off valve [2] on the bypass pipe.
Concluding work
1.
1.
Plug the device back in to the voltage supply.
Plug the device back in to the voltage supply.
2.
2.
Carry out commissioning, see chapter “5. Commissioning” on Page 26.
Carry out commissioning, see chapter “5. Commissioning” on Page 26.