Mechanical installation
Version: 2.2
───
71
XTS
7.2.3
System test
Before beginning with the assembly of the guide rails, check the
functionality of the modules. You can determine whether you have
assembled the modules properly and fully as well as identifying de-
fects.
Power supply
1
2
► Connect the entire system 1 to the power supply without guide
rails
► First switch the 24 V on, then the 48 V
► Make sure that the LEDs 2 light up
1
The following LEDs 1 must light up:
• Link / Act
• 48 V / 16 A
• 24 V / 4 A
If the LEDs do not light up:
► Check the power supply units and fuses for voltage
► Check whether the connector card has been inserted
► Contact the Support/Applications Department
TwinCAT
Beckhoff also recommends checking the modules using the Twin-
CAT software.
► Start a TwinCAT project
► Scan the modules
► Check the modules for functionality