3-1
Z MED Medical Air System
4107 9022 67.00
3.1 Prestart-Up
The contractor should notify
BeaconMedæs
two
weeks prior to start-up date to schedule an ap-
pointment for an authorized technician to re-
view the installation prior to start-up.
CAUTION:
Failure to install the unit properly
and have a
BeaconMedæs
authorized techni-
cian start-up the system can void the manufac-
turer’s warranties.
Prestart-up and start-up procedures should be
performed for a new installation or when major
maintenance has been performed.
The main power source to the control panel
should be “OFF” for the duration of the visual in-
spection.
Ensure that the equipment is installed on a solid
level surface. Walk around the system to ensure
that there is enough clearance on all sides to
perform operational checks and maintenance.
Check all piping system joints that might have
come loose during shipment and installation to
ensure they are tight.
Check all of the compressors, dryers, air receiver
and control panels for damage.
Check all valves for full open and full close travel.
Ensure that the systems valves are positioned
for proper operation. (Refer to labeling on valve
handles.)
Check the Central Control System cabinet on the
Dryer Module.
Verify electrical service. Before starting the Z
Med Medical Air System, check to see that volt-
age, amperage, and wire size are appropriate.
CAUTION:
Electrical service must be as speci-
fied or damage to equipment may occur.
Open the electrical cabinet by loosening the fas-
teners on the front.
CAUTION:
Vibration during shipment and in-
stallation can loosen electrical terminals, fuse
inserts, and mechanical connections. Tighten as
necessary.
Check the electrical cabinet for any broken
switches, lights, etc.
Check that all motor starter connections are
tight and that there are no loose objects such as
terminal lugs, screws, nuts, etc., in the cabinet.
3.0 System Operation
WARNING!
For Prestart-Up and start-up procedures
for the compressor units, refer to the
individual manuals supplied separately
with those units.
WARNING!
Prior to putting the Z MED Medical Air
System into use, the medical facility must
have a certifier perform all installation
tests as specified in NFPA 99. The medi-
cal facility responsible is also responsible
for ensuring that the system meets the
minimum requirements as specified in
NFPA 99.
WARNING!
Have more than one person on hand dur-
ing prestart-up and start-up procedures
to ensure operator safety and to facilitate
certain checks.
WARNING!
To prevent electrical shock, ensure that
“All” electrical power to the system is
“Off”. Including the disconnect switches
and H-O-A switches on the Dryer Control
Panel. The facility’s circuit breaker should
also be locked out.