
32
Setting Up the Pump
Manual 41018v0800
SIGMA Spectrum Infusion System
Revision B
Operator’s Manual
WARNING
ESD Sensitivity.
Do not touch the battery pin set when the Battery Module is removed.
CAUTION
Maintain Battery Charge.
To maintain battery charge, keep the Pump’s AC Power Adaptor
plugged into a powered outlet whenever possible, including when the
Pump is not in use.
CAUTION
Recyclable Battery Pack. Dispose of Properly.
The SIGMA Spectrum Infusion System contains a lithium-ion
rechargeable battery pack and a replaceable battery cell. Improper
disposal can result in hazards to humans or environmental
conditions.
Do not dispose of batteries in trash or in fire. These batteries are
recyclable and should be disposed of properly.
Contact an authorized disposal center or return the battery to
Baxter for disposal if an authorized disposal center cannot be
found.
The Pump’s battery is charging whenever the AC Power Adaptor is plugged into a powered outlet
and is connected to the Pump. It is not necessary to power on the Pump to charge the battery.
Ensure that the battery is fully charged prior to first use. The approximate time to initially charge
the battery is as follows:
■
Standard Battery charge time: 12 hours
■
Wireless Battery Module charge time: 16 hours
For battery power and capacity specifications, see Appendix A: “Specifications” on page 133.
For a list of the icon symbols used and their descriptions, see “Pump Icons” on page 21.
Configuring User Options
The SIGMA Spectrum Infusion System has two sets of configuration options:
■
User options
■
Biomed options
For a description of the Biomed options, refer to the
SIGMA Spectrum Infusion System
Service Manual (P/N 41019v0800)
.
WARNING
Operation is Limited to Trained Operators.
SIGMA Spectrum Infusion Pump operation is strictly limited to trained
operators who are competent in safe SIGMA Spectrum Infusion
Pump operation and in safe IV therapy practices. Pump owners have
sole responsibility for operator training and testing even when Baxter
personnel assist in training processes.