![Baxi Bioflo 12 kW Pear User Operating Instructions Manual Download Page 24](http://html.mh-extra.com/html/baxi/bioflo-12-kw-pear/bioflo-12-kw-pear_user-operating-instructions-manual_2711691024.webp)
23
Operation
5s
RESET
5s
RESET
5s
RESET
5s
RESET
5s
RESET
Fig. 56
Fig. 57
Fig. 58
Fig. 59
Press the
Menu button – Fig. 57.
Confirm the selected menu item „Operator level“ by pressing the
Choose button – Fig. 58.
Use the
arrow buttons to select the „Boiler cleaning“ sub-menu
item – Fig. 59.
Confirm the selected „Boiler cleaning“ sub-menu item by pressing
the
Choose button – Fig. 60.
Fig. 60
Boiler temperature
(Operating phases)
Lighting ON
42
°C
Boiler temperature
(Operating phases)
Info
Menu
42
°C
Operator level
Service level
Choose
Back
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose
Back
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose
Back
2.8.1.1
Boiler cleaning -
Resetting the cleaning request
After boiler cleaning has been performed (section 3.1), boiler cle-
aning must be confirmed so that the operating time until the next
boiler cleaning is restarted.
Pressing one of the six buttons switches the lighting and display
on – Fig. 56.
Boiler cleaning must not
be reset if cleaning has not been
carried out.