16. Removal and installation of the projector covers
16.8 Installation of the top cover plate of the Light Processor compartment
Necessary tools
3mm Allen wrench.
How to install the top cover plate from the Light Processor compartment?
1. Install the top cover plate as follows:
a) Approach the projector with the top cover plate tilted as illustrated and insert the two hooks of the top cover plate into the
projector chassis (see detailed illustration image 16-10).
b) Lower the top cover plate completely.
c) Grip the two knobs (reference 2 image 16-10) , slide the top cover plate to the rear side of the projector and ensure that all
slots (reference 1 image 16-10) of the top cover plate are engaged.
2
1
C
C
A
B
Image 16-10
2. Fasten the top cover plate with four screws (reference 1 image 16-11). Use a 3mm Allen wrench.
150
R5905961 ZEUS 09/03/2015
Summary of Contents for ZEUS
Page 1: ...ZEUS Installation safety manual R5905961 00 09 03 2015 ...
Page 17: ...2 Safety PR Image 2 2 R5905961 ZEUS 09 03 2015 13 ...
Page 26: ...3 Getting started 22 R5905961 ZEUS 09 03 2015 ...
Page 44: ...6 Lenses Lens selection 40 R5905961 ZEUS 09 03 2015 ...
Page 84: ...10 Starting up 80 R5905961 ZEUS 09 03 2015 ...
Page 96: ...11 Scheimpflug 92 R5905961 ZEUS 09 03 2015 ...
Page 104: ...12 Convergence 100 R5905961 ZEUS 09 03 2015 ...
Page 128: ...13 Lamp House Lamp replacement 124 R5905961 ZEUS 09 03 2015 ...
Page 160: ...16 Removal and installation of the projector covers 156 R5905961 ZEUS 09 03 2015 ...
Page 176: ...18 Pin configurations 172 R5905961 ZEUS 09 03 2015 ...
Page 184: ...19 Environmental information 180 R5905961 ZEUS 09 03 2015 ...