![Barco SIM 7Q User Manual Download Page 256](http://html1.mh-extra.com/html/barco/sim-7q/sim-7q_user-manual_4252219256.webp)
8. Maintenance
8.4.3
Resetting the lamp runtime
Necessary tools
No tools.
Description
The lamp runtime must be reset whenever a lamp is replaced by a new one.
W
ARNING
:
Both lamp runtime reset and lamp replacement can only be done by Barco trained and quali
fi
ed
service technicians.
Resetting the lamp runtime
1. In the projector’s OSD, browse to
Lamps > Reset runtime
.
Image 8-36
2. Press
ENTER
to con
fi
rm.
A dialog box is displayed
Image 8-37
3. Enter the serial number of the new lamp.
4. Press
ACCEPT
to con
fi
rm the serial number.
The lamp runtime is now set to zero.
5. Exit the menu.
252
R59770066 SIM 7Q SERIES 07/10/2013
Summary of Contents for SIM 7Q
Page 8: ...Table of contents 4 R59770066 SIM 7Q SERIES 07 10 2013...
Page 13: ...2 Packaging 2 PACKAGING Overview Unpacking R59770066 SIM 7Q SERIES 07 10 2013 9...
Page 16: ...2 Packaging 12 R59770066 SIM 7Q SERIES 07 10 2013...
Page 62: ...5 Setup 2 Now the zoom and focus can be adjusted 58 R59770066 SIM 7Q SERIES 07 10 2013...
Page 74: ...6 Getting started 70 R59770066 SIM 7Q SERIES 07 10 2013...
Page 194: ...7 Advanced Image 7 157 190 R59770066 SIM 7Q SERIES 07 10 2013...
Page 245: ...8 Maintenance Image 8 13 Electronics filter removing R59770066 SIM 7Q SERIES 07 10 2013 241...
Page 260: ...9 Troubleshooting 256 R59770066 SIM 7Q SERIES 07 10 2013...
Page 270: ...A NVG option for SIM 7Q 266 R59770066 SIM 7Q SERIES 07 10 2013...
Page 274: ...B NVG option for SIM 7Q HC 270 R59770066 SIM 7Q SERIES 07 10 2013...
Page 275: ...C GLD alignment C GLD ALIGNMENT Overview Gamma values R59770066 SIM 7Q SERIES 07 10 2013 271...
Page 277: ...D Image files D IMAGE FILES Overview Image files R59770066 SIM 7Q SERIES 07 10 2013 273...
Page 282: ...Glossary 278 R59770066 SIM 7Q SERIES 07 10 2013...
Page 286: ...Index locking 57 282 R59770066 SIM 7Q SERIES 07 10 2013...
Page 288: ...List of tables 284 R59770066 SIM 7Q SERIES 07 10 2013...