R5900087 /04
ClickShare CSE-200+
36
4.1 Installation methods for the Base unit
For optimal performance, install the Base unit close to the display and avoid obstacles between the
Base unit and the Buttons.
Make sure not to install the Base Unit in a metal enclosure.
Introduction to the installation methods
The Base unit can be installed in different ways in a meeting room.
•
Table mount
•
Wall mount
A Kensington lock is foreseen on one side of the Base Unit.
WARNING:
Ceiling mount is not allowed !
4.2 Table mounting
Overview
Put the Base Unit directly on the meeting room table.
The total weight of the Base Unit is 600 g.
4.3 Wall mounting
About wall mounting
No mounting bracket is needed to install the Base unit on the wall. The Base Unit can be mounted in any
position on the wall, but it is preferred to mount it with the connections downwards.
The total weight of the Base Unit is 600 g.
Required tools
•
a drill (type of drill depends on the type of wall)
•
Screwdriver (depending on the used screws)
Required parts
•
2 mounting screws, maximum head diameter of 6.5 mm
•
2 plugs
How to install
1.
Drill two holes in the wall or ceiling as indicated on the drawing.
Horizontal distance : 162 mm,
Summary of Contents for ClickShare CSE-200+
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual ClickShare CSE 200...
Page 101: ...101 R5900087 04 ClickShare CSE 200 Firmware updates 7...
Page 103: ...103 R5900087 04 ClickShare CSE 200 Troubleshooting 8...
Page 107: ...107 R5900087 04 ClickShare CSE 200 Environmental information 9...
Page 111: ...R5900087 04 ClickShare CSE 200 111 Environmental information...