
8B. Service
88
- Must be performed by a technician -
8B-2-5 Gun Tower (L) and (R) Assemblies
Symptom
Cause
Solution
Reference
section
·The side LED does not
light up.
·The tape LED is out.
·Replace the tape LED.
P-120
·A connector is disconnected.
·Connect the connector securely.
P-120
·The USIO (T) PC board is
malfunctioning.
·Replace the USIO (T) PC board.
P-103
·The switching regulator (12 V) is
malfunctioning.
·Replace the switching regulator (12 V).
P-99
Summary of Contents for Time Crisis 5
Page 137: ...9 Disposal 137 1 2 3 4 5 6 7 8A 8B 9 10 11 Disposal Test Mode Troubleshooting...
Page 138: ...138 10 Parts List 10 1 Overall...
Page 140: ...10 Parts List 140 10 2 Front Assembly...
Page 142: ...10 Parts List 142 10 3 Monitor Tower L Assembly Same applies to the other side USIO T PC board...
Page 144: ...10 Parts List 144 10 4 Monitor Tower R Assembly Same applies to the other side USIO T PC board...
Page 146: ...10 Parts List 146 10 5 ES3X Assembly Hard disk...
Page 148: ...10 Parts List 148 10 6 Coin Box Assembly 1 2...
Page 152: ...10 Parts List 152 10 7 Signboard Assembly...
Page 154: ...10 Parts List 154 10 8 Cord Box Assembly...
Page 156: ...10 Parts List 156 10 9 Gun Tower L Assembly 1 2 Pedal assembly Body L assembly...
Page 158: ...10 Parts List 158 10 9 Gun Tower L Assembly 2 2...
Page 160: ...10 Parts List 160 10 10 Gun Tower R Assembly 1 2 Pedal assembly Body L assembly...
Page 162: ...10 Parts List 162 10 10 Gun Tower R Assembly 2 2...
Page 164: ...10 Parts List 164 10 11 Gun Assembly...
Page 166: ...10 Parts List 166 10 12 Pedal Assembly Same applies to the other side Opposite side...
Page 168: ...10 Parts List 168 MEMO...
Page 174: ......