
7. Operation
49
1
2
3
4
5
6
7
8A
8B
9
10
11
Operation
Tro
ub
les
ho
otin
g
Test Mode
Test Mode
7-7-5 Input/Output Test of Switches (I/O TEST)
This screen is used to test each switch and control for input/output.
1
In the MENU screen, select I/O TEST using the Select switch and press the Enter switch. The
I/O TEST screen appears.
I/O TEST screen
Item
Description
Setting
(a) LINK
Displays the communication status between the
cabinets.
ON
OFF
NG
(b) LINK AS
Displays the CPU ID status.
1(LEFT)
2. (RIGHT)
(1) SWITCH TEST
Tests switch inputs.
See P-50 "(1) SWITCH TEST".
(2) LED TEST
Tests LEDs.
See P-51 "(2) LED TEST".
(3) LINK TEST
Tests link between the cabinets.
See P-52 "(3) LINK TEST".
(c) I/O PCB
Displays the PCB CHECK status.
In a normal state, CONNECT OK appears in green.
In an abnormal state, CONNECT NG! appears in red.
(d)
Displays the transmitted data without modification.
2
Select an item using the Select switch. The selected item blinks.
3
Press the Enter switch to enter the selected item.
4
After entering the selection, flip the Select switch up or down to change the item setting.
5
After changing the setting, press the Enter switch to return to the item selection screen.
6
Select EXIT and press the Enter switch to return to the MENU screen.
Summary of Contents for Time Crisis 5
Page 137: ...9 Disposal 137 1 2 3 4 5 6 7 8A 8B 9 10 11 Disposal Test Mode Troubleshooting...
Page 138: ...138 10 Parts List 10 1 Overall...
Page 140: ...10 Parts List 140 10 2 Front Assembly...
Page 142: ...10 Parts List 142 10 3 Monitor Tower L Assembly Same applies to the other side USIO T PC board...
Page 144: ...10 Parts List 144 10 4 Monitor Tower R Assembly Same applies to the other side USIO T PC board...
Page 146: ...10 Parts List 146 10 5 ES3X Assembly Hard disk...
Page 148: ...10 Parts List 148 10 6 Coin Box Assembly 1 2...
Page 152: ...10 Parts List 152 10 7 Signboard Assembly...
Page 154: ...10 Parts List 154 10 8 Cord Box Assembly...
Page 156: ...10 Parts List 156 10 9 Gun Tower L Assembly 1 2 Pedal assembly Body L assembly...
Page 158: ...10 Parts List 158 10 9 Gun Tower L Assembly 2 2...
Page 160: ...10 Parts List 160 10 10 Gun Tower R Assembly 1 2 Pedal assembly Body L assembly...
Page 162: ...10 Parts List 162 10 10 Gun Tower R Assembly 2 2...
Page 164: ...10 Parts List 164 10 11 Gun Assembly...
Page 166: ...10 Parts List 166 10 12 Pedal Assembly Same applies to the other side Opposite side...
Page 168: ...10 Parts List 168 MEMO...
Page 174: ......