Operator’s Manual 76
- Check the air gap distance between the Left Band Out reed switch and the
magnet. The distance should be a maximum of 1/8 inch (3 mm). If it is within the
suggested range then the reed switch needs to be replaced.
- If the Left Band Full cylinder is partially extended,
- Check that a foreign object is not preventing the Left Band Full cylinder from
extending.
- Electric power or hydraulic power or hydraulic return has been disconnected or
shut off from machine.
- Remove and observe all 4 Band Position check valves. If the snap ring in the
bottom of the check valve is missing then the check valve needs to be replaced. If
you are unable to push the plunger from the end of the check valve in and it
spring back, then the check valve needs to be replaced.
- If the Left Band Full cylinder is still retracted,
- Check that hydraulic power is still on to the machine and that return line is still
connected.
- Check that a foreign object is not preventing the Left Band Full cylinder from
extending.
- Remove and observe all 4 Band Position check valves. If the snap ring in the
bottom of the check valve is missing then the check valve needs to be replaced. If
you are unable to push the plunger from the end of the check valve in and it
spring back, then the check valve needs to be replaced.
- Check that the directional valve is not stuck.
065 Waiting for Right Band Out reed switch to be on.
Note: After the machine has extended the Right/Left Full Band cylinders, the Right
Band Out reed switch should be lined up with the Right Band magnet, which turns the
switch on. This is what the machine is waiting for.
- If the Right Band Full cylinder is fully extended,
- Check the air gap distance between the Right Band Out reed switch and the
magnet. The distance should be a maximum of 1/8 inch (3 mm). If it is within the
suggested range then the reed switch needs to be replaced.
- If the Right Band Full cylinder is partially extended,
Summary of Contents for GFC 100
Page 2: ......
Page 4: ......
Page 8: ...Operator s Manual 3 Serial Number Location...
Page 10: ...Operator s Manual 5 Safety Decals...
Page 11: ...Operator s Manual 6 Safety Decals...
Page 12: ...Operator s Manual 7 Safety Decals...
Page 13: ...Operator s Manual 8...
Page 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Page 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Page 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Page 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Page 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Page 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...