Operator’s Manual 21
Daily Maintenance – 8 hours
Cleanliness
The entire Bale Bandit should be cleaned of all hay and chaff daily.
Give special attention to the banding box. Clean around the four guide posts of the
banders.
Compressed air is the fastest and most effective way to remove trash.
Clean the three photo eye sensors, making sure all oil and grease is removed.
Fasteners
Check for loose bolts and fasteners. If bolt/nut is loose or removed replace with Loctite
or new lock nut.
Lubrication
Lubrication Location
Time Frame
(hours)
# of
Zerts
Front caster wheel
8
2
Vertical plunger swing cylinder
8
2
Vertical plunger main pivot
8
2
Kicker cylinder yoke
8
1
Kicker rotation shaft
8
2
Horizontal Elevator
8
1
Vertical elevator
8
1
Summary of Contents for GFC 100
Page 2: ......
Page 4: ......
Page 8: ...Operator s Manual 3 Serial Number Location...
Page 10: ...Operator s Manual 5 Safety Decals...
Page 11: ...Operator s Manual 6 Safety Decals...
Page 12: ...Operator s Manual 7 Safety Decals...
Page 13: ...Operator s Manual 8...
Page 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Page 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Page 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Page 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Page 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Page 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...