Operator’s Manual 49
If the Kicker cylinder is still extended,
- Check that hydraulic power is still on to the machine and that return line is still
connected.
- Check that a bale or foreign object is not preventing the Kicker from retracting.
- Check that the directional valve is not stuck.
019 Waiting for Horizontal Plunger reed switch to be off.
Note: Before the machine extends the Horizontal Plunger cylinder, the Horizontal
Plunger reed switch is in front of the first set of magnets. When the machine extends the
Horizontal Plunger cylinder it moves the first magnet away from the switch, which
turns the Horizontal Plunger reed switch off. This is what the machine is waiting for.
Summary of Contents for GFC 100
Page 2: ......
Page 4: ......
Page 8: ...Operator s Manual 3 Serial Number Location...
Page 10: ...Operator s Manual 5 Safety Decals...
Page 11: ...Operator s Manual 6 Safety Decals...
Page 12: ...Operator s Manual 7 Safety Decals...
Page 13: ...Operator s Manual 8...
Page 31: ...Operator s Manual 26 Hydraulic Manifold Layout Front Manifold...
Page 32: ...Operator s Manual 27 Inside Banding Box Manifold...
Page 33: ...Operator s Manual 28 Outside Banding Box Manifold...
Page 34: ...Operator s Manual 29 Electrical Layout Front Relay Box located behind banding drums...
Page 35: ...Operator s Manual 30 Band Relay Box located in Banding Box...
Page 52: ...Operator s Manual 47 If the Vertical Plunger cylinder is fully retracted...