4‐4 Operation
MN2408
Alarms
Following alarms are available:
Sensor fail (FLS)
see Table 4‐10
Sensor fail is detected when measured value is 6% out of selected sensor characteristic.
Sensor fail is indicated by ##### symbol instead measured value.
Warning (WRN)
see Table 4‐10
When warning comes up, only alarm outputs and common warning output are closed.
Shut down (SD)
see Table 4‐10
When the shut-down alarm comes up, InteliLite opens outputs GCB CLOSE/OPEN, FUEL
SOLENOID, STARTER and PRESTART to stop the engine immediately. Alarm outputs and
common shutdown output are closed. Active or not reset protection disables start.
Table 4‐10 Possible Warnings
Events specification
Protection type
Wrn Oil press
WRN
Sd Oil press
SD
Wrn Water temp
WRN
Sd Water temp
SD
Wrn Wtemp Low
WRN
Wrn Fuel Level
WRN
Sd Fuel Level
SD
Battery voltage <, >
WRN
Battery flat
SD
Start fail
SD
Vgen <, >
SD
Vgen unbl
SD
Fgen <, >
SD
Igen unbl
SD
Overload
SD
RPM over
SD
RPM under
SD
PickupFault
SD
Stop fail
SD
WrnServiceTime
WRN
Emergency Stop
SD
ECU Common Warning
WRN
ECU Shutdown
SD
Summary of Contents for GLC10
Page 12: ...2 2 General Information MN2408...
Page 24: ...2 14 General Information MN2408...
Page 40: ...3 16 Receiving Installation MN2408...
Page 58: ...4 18 Operation MN2408 Figure 4 15 Engine Controller Inputs Outputs...
Page 70: ...4 30 Operation MN2408 Figure 4 16 Configuration Data Sheet j j j j j j j j j...
Page 74: ...4 34 Operation MN2408...
Page 88: ...A 10 Series GLC MN2408...
Page 90: ...B 2 Series GLC MN2408 Figure B 11 Customer Interface Connection Diagram MEC20 MEC2...
Page 91: ...Series GLC B 3 MN2408 Figure B 12 Customer Interface w o Breaker Power Connection Diagram...
Page 92: ...B 4 Series GLC MN2408 Figure B 13 Single Phase w o Breaker Connection Diagram...
Page 93: ...Series GLC B 5 MN2408 Figure B 14 Single Phase One Breaker Connection Diagram...
Page 94: ...B 6 Series GLC MN2408 Figure B 15 Single Phase Two Breaker Connection Diagram...
Page 99: ...Series GLC B 11 MN2408 Figure B 20 Three Phase Connection Diagram...
Page 100: ...B 12 Series GLC MN2408 Figure B 21 Three Phase Connection Diagram with PMG...
Page 101: ...Series GLC B 13 MN2408 Figure B 22 Three Phase Connection Diagram Wire 1 0 and larger...
Page 106: ...B 18 Series GLC MN2408 Figure B 27 Control Box Connections with MEC20 Controller...
Page 107: ...Series GLC B 19 MN2408 Figure B 28 Control Box Connections with MEC20 Controller Governor...
Page 108: ...B 20 Series GLC MN2408 Figure B 29 Control Box Connections with MEC2 Controller...
Page 109: ...Series GLC B 21 MN2408 Figure B 30 Engine Wiring Woodward 4 3L GM...
Page 110: ...B 22 Series GLC MN2408 Figure B 31 Engine Wiring Woodward 5 7L GM...
Page 111: ...Series GLC B 23 MN2408 Figure B 32 Engine Wiring Woodward 8 1L GM...
Page 112: ...B 24 Series GLC MN2408...
Page 113: ...Baldor District Offices...