Receiving & Installation 3‐15
MN2408
Post Installation Checks
Continued
22. With the engine running, several checks must be made:
a.
Verify there are no fuel leaks. If a fuel leak is detected, stop the engine
immediately (move the Master Control Switch to the “Stop” position) and
repair the leak before proceeding.
b.
Verify there are no coolant or oil leaks. If a leak is detected, stop the engine
immediately and repair the leak before proceeding.
c.
Verify that operation is smooth. If belt squeals, vibrations or other sources of
noise exist, stop the engine immediately and repair before proceeding.
d.
Verify that the correct voltage exists (line-to-line and line-to-neutral) at the
generator and at the transfer switch.
e.
Minor adjustment of the output voltage is made using the “Voltage Adjust”
potentiometer on the control panel.
WARNING: Engine coolant is under pressure and is near the boiling point of water when engine is hot.
Do not open the coolant system until the engine has completely cooled. Hot coolant can
cause severe burns and other injuries. When engine is cool, coolant level can be checked.
23. After the operation checks are made, stop the engine (move the Master Control Switch
to the “Stop” position) and wait at least 2 hours for the engine to cool. When the
engine is cool, check engine oil and coolant levels as instructed in the engine operation
manual.
24. Close all enclosure covers. The post installation checks are now complete.
Summary of Contents for GLC10
Page 12: ...2 2 General Information MN2408...
Page 24: ...2 14 General Information MN2408...
Page 40: ...3 16 Receiving Installation MN2408...
Page 58: ...4 18 Operation MN2408 Figure 4 15 Engine Controller Inputs Outputs...
Page 70: ...4 30 Operation MN2408 Figure 4 16 Configuration Data Sheet j j j j j j j j j...
Page 74: ...4 34 Operation MN2408...
Page 88: ...A 10 Series GLC MN2408...
Page 90: ...B 2 Series GLC MN2408 Figure B 11 Customer Interface Connection Diagram MEC20 MEC2...
Page 91: ...Series GLC B 3 MN2408 Figure B 12 Customer Interface w o Breaker Power Connection Diagram...
Page 92: ...B 4 Series GLC MN2408 Figure B 13 Single Phase w o Breaker Connection Diagram...
Page 93: ...Series GLC B 5 MN2408 Figure B 14 Single Phase One Breaker Connection Diagram...
Page 94: ...B 6 Series GLC MN2408 Figure B 15 Single Phase Two Breaker Connection Diagram...
Page 99: ...Series GLC B 11 MN2408 Figure B 20 Three Phase Connection Diagram...
Page 100: ...B 12 Series GLC MN2408 Figure B 21 Three Phase Connection Diagram with PMG...
Page 101: ...Series GLC B 13 MN2408 Figure B 22 Three Phase Connection Diagram Wire 1 0 and larger...
Page 106: ...B 18 Series GLC MN2408 Figure B 27 Control Box Connections with MEC20 Controller...
Page 107: ...Series GLC B 19 MN2408 Figure B 28 Control Box Connections with MEC20 Controller Governor...
Page 108: ...B 20 Series GLC MN2408 Figure B 29 Control Box Connections with MEC2 Controller...
Page 109: ...Series GLC B 21 MN2408 Figure B 30 Engine Wiring Woodward 4 3L GM...
Page 110: ...B 22 Series GLC MN2408 Figure B 31 Engine Wiring Woodward 5 7L GM...
Page 111: ...Series GLC B 23 MN2408 Figure B 32 Engine Wiring Woodward 8 1L GM...
Page 112: ...B 24 Series GLC MN2408...
Page 113: ...Baldor District Offices...