
How to Assemble tHe Allegro tower oF Power
Thank you for purchasing the Balanced Body Allegro Tower of Power.
The following step-by-step instructions provide guidance for assembly
and installation.
Parts List
Prior to assembly, check the parts and components you received against
the following list. If you are missing any parts, please contact the
Balanced Body customer service department at 1-800-PILATES
(1-800-745-2837).
700-001 Tower of Power Frame
Qty
Part number
Description
1
600-000 Bent Frame
1
TRP0047 Assembly, Aluminum Push-Through Bar
1
GEN9406 Tee Handle Pin
Box containing parts
Qty
Part number
Description
2
700-002 T-slot bracket (left and right)
2
600-009 Knob Spacer
2
600-010 Pulley Spacer
4
600-011 Delrin Washer
2
GEN9857 Long Black Knobs
2
700-003 Adjustable Pulley
2
600-012 Spring Standoff
2
GEN9847 4” Eyebolt
2
GEN9021 Nylock Nut
1
900-005 Bungee with hooks for Tower
1
GEN9282 5/32” Allen Key
2
SPR9001 Red Spring
2
SPR9002 Yellow Trap Spring
2
SPR9461 Leg Spring (Standard)
2
SPR9006 Leg Spring, Yellow
1
710-010 Roll Down Bar
1
101-005 Single Cotton Loop, PAIR
1
SS6018 Safety Strap w/Carabiner
Required tools
5/32” Allen key (included)
Vise grips, pliers or adjustable wrench (not included)
Note: Additional tools may be required for installing the Standing
Platform Latch. Please refer to included Latch kit and instructions.
Assembly time
30-45 minutes
Prepare your workspace
Make sure you have enough physical space around your Allegro to work,
especially at the head-end of the machine.
Prepare your Allegro Reformer
Remove all
ropes and risers and pins from the Allegro. If you are
retrofitting the Tower onto an existing Allegro, you will thread your
ropes through the pulleys later (see “Threading the Ropes”).
Remove the Logo/Label (for Allegros purchased before 2/1/04)
Allegros built prior to February 1, 2004, use a full-length logo/label
inserted on both sides of the Allegro frame. This label runs from the
stop screw at the foot end of the frame to the corner of the head-end
of the frame, and is backed with corrugated material. This label and
backing material must be removed for Tower installation. You can order
a new logo/label free of charge by calling 1-800-PILATES. Allegros built
after February 1, 2004, include a shorter label that does not need to be
removed.
Figure 1
Install the Support Brackets (Part# 700-002)
Find the left and right T-Slot Support Bracket Assemblies among the
parts. Figure 1 indicates the proper orientation of the left and right
brackets at the head-end of the frame.
Loosen the four screws on each bracket assembly until all the plates in
the bracket assembly are completely loose and can move independently
of each other. (see Figure 2). The bracket assembly is held together
with “capture screws”.
T-slot bracket assembly–left
Footbar End
Standing platform
Head-End
Note: Left and Right as viewed from this end.
T-slot bracket assembly–right
8