OWNER’S MANUAL |
SKIRTS
36
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)
Printed in Canada. Copyright © May 2017 BainUltra Inc. All rights reserved. 45220001
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
SKIRTS
SJ-3 SE
INSTALLATION
2. INSTALLATION (NEXT)
2-2
Hold level against bath rim and mark
dashes around the bath every 6’’ (15.2 cm).
2-3
Mark a second set of dashes 2’’ closer to
the bath. This is where the toe kick will be.
2-4
Join the second set of dashes together.
This will reproduce the bath’s curve.
2-5
Mark the center of this curve.
2-6
Position center toe kick just behind the
curved line and center it by aligning the
notch under it with the guideline on
the floor.
2-7
Screw center toe kick to floor, starting
with the two screws in the middle.
NOTE
You may have to bend the toe kick slightly
to match the curve drawn on the floor.
2-8
Place left and right toe kicks on either side
as shown and screw to floor.
NOTE:
Cut left and right toe
kicks as needed.
2-9
Install the four retainer clips on the wood
blocks and secure in place with #8 x 1/2”
screws.
6"
[15,2 cm]
2"
[5 cm]
6"
[15,2 cm]
2"
[5 cm]
2-4
2-5
2-2
2-3
2-8
2-6
3/4"
[1,9 cm]
2-9
SJ-3 SE - INSTALLATION