OWNER’S MANUAL |
SKIRTS
32
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)
Printed in Canada. Copyright © May 2017 BainUltra Inc. All rights reserved. 45220001
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
SKIRTS
2. INSTALLATION (NEXT)
14"
(35,6 cm)
SJ-1 : 2
1/2
"
(6,4 cm)
SJ-2 : 2
1/4
"
(5,7 cm)
2-2
2-3
2-5
3/4"
[1,9 cm]
2-4
2-2
Holding a level against the side of the
bath, mark a guideline on both walls.
2-3
Trace a line on the floor to connect
both lines.
2-4
Install the retainer clips on the wood blocks
and secure in place with #8 x 1/2” screws.
2-5
Fasten two wood blocks to the floor
14” (35.6 cm) from the center of the bath.
Space them 2 1/2” (6.4 cm) from the floor
guideline.
2-6
Insert top of panel between the bath rim
and retainer clips under the bath ledge.
2-7
Fasten skirt to blocks with screws.
NOTE:
It is recommended that
you apply a silicone joint to the
bath base to ensure a tight seal.
SJ-1 - INSTALLATION
2-6
2-7
SJ-1
INSTALLATION